Bring service dates and fault reports together
The agent reads the fault reports from the reporting portal and the service cycles from the CAFM. It links every report to the system concerned.
Portfolio WA-5063, 63 services linked to 22 open reportsUses data to optimise maintenance and servicing processes.
Developed in Germany · Hosted in the EU or on-premises
Delivered together with
Fault reports arrive through the reporting portal, maintenance records sit in the CAFM, budgets in the ERP. The facility manager sees the overdue service when he opens the property record, which he does when a report comes in. By then the service has become an emergency call-out, paid from the current quarter's budget.
Getting the eleven overdue dates into the quarterly plan rather than first into the fault report is what delivers 25% fewer unplanned measures.
The 25% reduction in unplanned measures is this agent's headline figure. That three of the four call-outs in a quarter can be traced back to an overdue service is a plausible scenario in technical management, not the result of an analysis.
The agent reads the fault reports from the reporting portal and the service cycles from the CAFM. It links every report to the system concerned.
Portfolio WA-5063, 63 services linked to 22 open reportsThe agent ranks the open items by deadline, statutory inspection duty and reported fault frequency. For each item it notes why it is ranked there.
Ranked list with 11 overdue dates, lift in Building C 4 months overdueThe agent checks the list of measures against the quarter's maintenance budget. It shows which items slip into the next quarter depending on the order chosen.
planentwurf_WA-5063.xlsx with 3 variants at the budget lineIt shows the overdue cycle and the cluster of reports. The qualified inspector assesses the condition on site during the walk-through.
Its view stops at the data in the CAFM and the reporting portal. Anything the caretaker notices on his rounds but does not write up as a report is missing from the ranking.
The draft plan with three variants goes to the facility manager. He signs off the contract award and the budget release.
Connected systems
Operations
A pilot typically runs on your own data within 4 to 6 weeks. The agent connects to your existing systems rather than running as a separate, parallel environment.
EU cloud or private cloud. Processing is GDPR-compliant and models are never trained on your data. Details in the Trust Center.
It is based on experience from comparable projects and process benchmarks, not a commitment. We work out the realistic effect for your organisation during the assessment before the pilot.