Match the rejection to the case
Case MK-8143/26, error code Z18, received 30 October 2026 at 03:12
Energy
It does not say which field is meant.Open agent
Enlarge demo
Developed in Germany · Hosted in the EU or on-premises
Delivered together with
Overnight, messages from market partners come in and are processed in the billing system. Whatever fails ends up on the exceptions list: error code, message reference, nothing else. The specialist opens the case, looks up the master data record in the ERP and compares field by field until the contradiction becomes apparent.
1,240
messages a night
UTILMD, MSCONS and APERAK arrive through market communication.
18
rejections
That is how many cases land on the morning's exceptions list with an error code.
4
fields per case
Metering point, balancing area, assignment date and contract type are checked against the master data record.
24
hours to respond
From receipt of the APERAK at 03:12, there are 24 hours, which in practice means the morning, because the switch date cannot be set retrospectively.
At 07:30, the 18 exceptions are on the desk with the field named rather than a bare error code; the specialist corrects them with 50% less manual review effort and sends the reply to the market partner before noon.
The 50% reduction in manual review effort is this agent's headline figure. Message volume and rejection rate reflect an ordinary overnight run; neither was actually counted.
The market communication specialist decides whether to correct or reject; the agent checks the incoming message against the master data and names the contradiction, the error code and the deadline.
Case MK-8143/26, error code Z18, received 30 October 2026 at 03:12
1 discrepancy: assignment date reported as 1 November 2026, stored as 1 December 2026
utilmd_korrektur_MK-8143-26.txt, 1 corrected field, to be processed by 31 October, 03:12, 24 hours after receipt
It files the draft correction with the case. The market communication specialist sends it to the market partner.
It names the field, the reported value and the stored value. Whether the message or the stored data is wrong, billing clarifies and enters the correction itself.
For case MK-8143/26, it records that the processing deadline expires on 31 October at 03:12. Whether someone calls beforehand, and what is agreed, is up to the market communication specialist.
Connected systems
EDIFACT converter
billing system
ERP
Operations
Deployment model
Data processing
Responsible teams
How quickly is the Market Communication Agent ready to use?
Where is the data processed?
Where does the figure “50% less manual review effort” come from?
All agents
50%
faster processing
Grid planning, engineering
15%
higher efficiency
Plant operations, engineering
60%
fewer corrections
EEG, Billing
55%
fewer manual exceptions
Market communication, switching processes
up to 70%
less manual routing effort
Customer service, back office
45%
faster fault diagnosis
Service, field service