Energy

EEG Billing Agent

The wrong remuneration rate comes to light when the plant operator does the maths.

Checks EEG billing systematically and catches discrepancies early.

Checks EEG billing systematically and catches discrepancies early.

Open agent

Enlarge demo

Public administration

Four processes that take up the most time today

Developed in Germany · Hosted in the EU

Developed in Germany · Hosted in the EU or on-premises

Delivered together with

Sovereign hosting in Germany, single-tenant from the first user.

Sovereign hosting in Germany, single-tenant from the first user.

Legal, tax and compliance expertise for legally sound deployment.

Legal, tax and compliance expertise for legally sound deployment.

Advisory and implementation for the public sector, starting with the AI readiness assessment.

Advisory and implementation for the public sector, starting with the AI readiness assessment.

One wrongly applied remuneration rate costs three runs.

The annual statement pulls the feed-in volume from meter data management, the rate from the contract and the key from the plant master data. If one of the three does not match the others, it gets lost in the volume. The error comes back as an objection, after which the credit note, report and booking are reversed one by one.

820

plants in the run

Rooftop, ground-mounted and wind all pass through the same annual statement.

5

remuneration variants

Commissioning year, plant size and marketing model produce different rates.

9

plants with an objection

For these, the rate applied does not match the contract version on file.

3

runs per objection

Cancel the credit note, recalculate, resubmit the report to the auditor.

Check the rate against the contract before the run, and 60% of the corrections disappear.

The 60% reduction in corrections is this agent's headline figure. Plant count, remuneration variants and the three runs per objection describe a typical annual billing run; none of it was counted.

Three steps through the process.

The EEG billing specialist decides which remuneration rate applies; the agent checks feed-in volume, contract version and the rate applied against each other and names every discrepancy with a reference.

1.

1.

Check the remuneration rate against the contract

For every plant, the agent reads the rate applied in the run and the rate from the contract version. If they differ, it records both values with references.

For every plant, the agent reads the rate applied in the run and the rate from the contract version. If they differ, it records both values with references.

820 plants checked, 9 with a differing rate, plant EEG-77451 at 8.11 instead of 7.52 ct/kWh

2.

2.

Check feed-in volumes for plausibility

The agent compares the billed annual volume with the time series in meter data management and with the same plant's previous year. Unusual jumps are flagged by month.

The agent compares the billed annual volume with the time series in meter data management and with the same plant's previous year. Unusual jumps are flagged by month.

Plant EEG-77451: 268 instead of 331 MWh, no meter reading for July 2026

3.

3.

Compile the review report for approval

For every flagged plant, the agent prepares a sheet with rate, volume, contract reference and the difference in euros. The EEG billing specialist decides what goes back into the run.

For every flagged plant, the agent prepares a sheet with rate, volume, contract reference and the difference in euros. The EEG billing specialist decides what goes back into the run.

pruefbericht_eeg_2026_lauf2.pdf, 9 plant sheets, difference 41,380 euros

What the agent does not do.

It does not set the remuneration.

It does not set the remuneration.

It shows the difference between the rate applied and the contract version, with both references. The EEG billing specialist decides which rate applies.

It does not cancel credit notes.

It does not cancel credit notes.

It flags the nine plants before the credit notes go out. The energy billing team triggers cancellation and recalculation in the billing system.

It cannot read an addendum that exists only on paper in the plant folder.

It cannot read an addendum that exists only on paper in the plant folder.

If the addendum for plant EEG-77451 is not in the contract master data, it keeps checking against the old rate. Once the specialist has entered the addendum, the check runs again.

Connected systems

Billing system

meter data management

contract management

Operations

Deployment model

EU cloud or private cloud

EU cloud or private cloud

Data processing

GDPR-compliant, no model training on your data

GDPR-compliant, no model training on your data

Responsible teams

EEG, Billing

EEG, Billing

The questions that come up before the first meeting.

How quickly is the EEG Billing Agent ready to use?

Where is the data processed?

Where does the figure “60% fewer corrections” come from?

Related agents.

All agents

Platform

Industries

Services

Resources

Company

Pricing

From AI strategy to a running platform: we show you the way.

Talk to us

Log in

DE

EN

English

Platform

Industries

Services

Resources

Company

Pricing

From AI strategy to a running platform: we show you the way.

Talk to us

Log in

DE

EN

English
neuland.ai

The AI management and orchestration platform from Cologne.

Developed in Cologne. Operated in the EU or in your data center.

Certifications and compliance: ISO 27001, ISO 9001, GDPR, EU AI Act, DORA, StBerG, and BRAO
WirtschaftsWoche Best of Technology 2026 seal, 2nd place in the Process Management category for neuland.ai

© 2026 neuland AI AG