Check the remuneration rate against the contract
820 plants checked, 9 with a differing rate, plant EEG-77451 at 8.11 instead of 7.52 ct/kWh
Energy
when the plant operator does the maths.Open agent
Enlarge demo
Developed in Germany · Hosted in the EU or on-premises
Delivered together with
The annual statement pulls the feed-in volume from meter data management, the rate from the contract and the key from the plant master data. If one of the three does not match the others, it gets lost in the volume. The error comes back as an objection, after which the credit note, report and booking are reversed one by one.
820
plants in the run
Rooftop, ground-mounted and wind all pass through the same annual statement.
5
remuneration variants
Commissioning year, plant size and marketing model produce different rates.
9
plants with an objection
For these, the rate applied does not match the contract version on file.
3
runs per objection
Cancel the credit note, recalculate, resubmit the report to the auditor.
Check the rate against the contract before the run, and 60% of the corrections disappear.
The 60% reduction in corrections is this agent's headline figure. Plant count, remuneration variants and the three runs per objection describe a typical annual billing run; none of it was counted.
The EEG billing specialist decides which remuneration rate applies; the agent checks feed-in volume, contract version and the rate applied against each other and names every discrepancy with a reference.
820 plants checked, 9 with a differing rate, plant EEG-77451 at 8.11 instead of 7.52 ct/kWh
Plant EEG-77451: 268 instead of 331 MWh, no meter reading for July 2026
pruefbericht_eeg_2026_lauf2.pdf, 9 plant sheets, difference 41,380 euros
It shows the difference between the rate applied and the contract version, with both references. The EEG billing specialist decides which rate applies.
It flags the nine plants before the credit notes go out. The energy billing team triggers cancellation and recalculation in the billing system.
If the addendum for plant EEG-77451 is not in the contract master data, it keeps checking against the old rate. Once the specialist has entered the addendum, the check runs again.
Connected systems
Billing system
meter data management
contract management
Operations
Deployment model
Data processing
Responsible teams
How quickly is the EEG Billing Agent ready to use?
Where is the data processed?
Where does the figure “60% fewer corrections” come from?
All agents
50%
less reporting effort
Sustainability, management
50%
less manual review effort
Billing, network operators
40%
faster case handling
Grid operations, control centre
55%
faster case resolution
Customer service, billing, legal
55%
fewer manual exceptions
Market communication, switching processes
50%
less review effort
Grid operations, billing, regulation