Check the device against the capacity threshold
Metering point DE0011277490100000000000000009463, 11 kW heat pump
Energy
Either way, the evidence has to be there at the end.Open agent
Enlarge demo
Developed in Germany · Hosted in the EU or on-premises
Delivered together with
Registration of the controllable consumption device reaches grid operations through the grid connection portal. Capacity, metering point and controllability are checked there; billing then has to set the right module for the reduced grid fee. The review note comes last, often written from memory and kept in a separate file.
1
registration
An 11 kW heat pump is registered via the grid connection portal.
7
checkpoints
Capacity, metering point, control box, grid connection, module choice, consent, timing.
2
departments
Grid operations checks controllability, billing sets the module.
3 weeks
until the note
The evidence is written up long after the case has been filed away.
If the review note is written while the case is being handled rather than three weeks later, the checking effort per device halves.
The 50% reduction in checking effort is this agent's headline figure. The seven checkpoints and three weeks until the note describe a typical process between grid operations and billing; they are illustrative, not counted.
The agent works through the case for the controllable consumption device point by point and writes the note with source references; grid operations signs off the grid connection.
Metering point DE0011277490100000000000000009463, 11 kW heat pump
Case SVE-2026-0847, 6 of 7 checkpoints evidenced
pruefvermerk_SVE-2026-0847.pdf, 7 checkpoints, 1 open item
It lays out the checkpoints and source references in order. The grid operations engineer signs off the connection.
It names the module that suits the device and shows where in the case it is still missing. Billing sets it.
It does see the electrician's completion notice for case SVE-2026-0847. If none arrives, it keeps the controllability checkpoint open.
Connected systems
Grid connection portal
GIS network documentation
billing system
Operations
Deployment model
Data processing
Responsible teams
How quickly is the § 14a EnWG Case Review Agent ready to use?
Where is the data processed?
Where does the figure “50% less review effort” come from?
All agents
55%
faster case resolution
Customer service, billing, legal
60 to 75%
less data entry effort
Grid services, customer service
60%
fewer corrections
EEG, Billing
55%
fewer manual exceptions
Market communication, switching processes
50%
less reporting effort
Sustainability, management
50%
less manual review effort
Billing, network operators