Assign the measure to the plants
The agent reads the measure log from the control system and narrows it down to the plants affected. For each plant it records start, end and setpoint.
Measure RD-2026-0912-3, 3 plants, 14:08 to 14:55Supports the analysis and documentation of redispatch measures.
Developed in Germany · Hosted in the EU or on-premises
Delivered together with
The control centre runs the measure and the control system logs the setpoints. The evidence also requires the feed-in time series, the plant master data and the contract status from the ERP. Today someone pulls these sources together by hand, often only once the operator asks.
Three plants times four sources make twelve cross-checks for 47 minutes of intervention, and doing them on the day of the measure rather than twelve days later means handling the case 40% faster.
The 40% speed-up in case handling is this agent's headline figure. The duration of the intervention, the number of plants and the time until the query reflect a typical sequence in grid operations; they are not measured values.
The agent reads the measure log from the control system and narrows it down to the plants affected. For each plant it records start, end and setpoint.
Measure RD-2026-0912-3, 3 plants, 14:08 to 14:55The agent lines up the feed-in time series, quarter-hour by quarter-hour, with the setpoint and the plant master data. Where the values do not match, it flags the quarter-hour.
12 cross-checks, quarter-hour 14:30 to 14:45 without a meter readingThe agent builds the report with a timeline, the curtailed energy per plant and the reference from each source. The redispatch specialist reviews and signs it.
massnahmenbericht_RD-2026-0912-3.pdf, 3 plant sheets, 1 open quarter-hourThe control centre runs the measure according to its own rules. The agent only comes in afterwards and records what was done.
It compiles the values per quarter-hour with their source. Billing determines what the operator is owed; the redispatch specialist signs the report.
If the meter value between 14:30 and 14:45 is missing, the gap stays visible and flagged in the report. The grid operations engineer decides whether a substitute value is calculated.
Connected systems
Operations
A pilot typically runs on your own data within 6 to 8 weeks. The agent connects to your existing systems rather than running as a separate, parallel environment.
EU cloud or private cloud. Processing is GDPR-compliant and models are never trained on your data. Details in the Trust Center.
It is based on experience from comparable projects and process benchmarks, not a commitment. We work out the realistic effect for your organisation during the assessment before the pilot.