Assign the measure to the plants
Measure RD-2026-0912-3, 3 plants, 14:08 to 14:55
Energy
The evidence for it takes days.Open agent
Enlarge demo
Developed in Germany · Hosted in the EU or on-premises
Delivered together with
The control centre runs the measure and the control system logs the setpoints. The evidence also requires the feed-in time series, the plant master data and the contract status from the ERP. Today someone pulls these sources together by hand, often only once the operator asks.
47
minutes of intervention
On 12 September 2026, output is curtailed between 14:08 and 14:55.
3
plants affected
Each has its own master data, its own contract status and its own time series.
4
sources per plant
Control system, meter time series, plant master data and contract must all show the same quarter-hour.
12
days until the query
That is how long it takes the operator to ask about the curtailed energy, and then everything has to be reopened.
Three plants times four sources make twelve cross-checks for 47 minutes of intervention, and doing them on the day of the measure rather than twelve days later means handling the case 40% faster.
The 40% speed-up in case handling is this agent's headline figure. The duration of the intervention, the number of plants and the time until the query reflect a typical sequence in grid operations; they are not measured values.
The agent gathers the data for a measure and documents the intervention; grid operations runs, assesses and bills the measure.
Measure RD-2026-0912-3, 3 plants, 14:08 to 14:55
12 cross-checks, quarter-hour 14:30 to 14:45 without a meter reading
massnahmenbericht_RD-2026-0912-3.pdf, 3 plant sheets, 1 open quarter-hour
The control centre runs the measure according to its own rules. The agent only comes in afterwards and records what was done.
It compiles the values per quarter-hour with their source. Billing determines what the operator is owed; the redispatch specialist signs the report.
If the meter value between 14:30 and 14:45 is missing, the gap stays visible and flagged in the report. The grid operations engineer decides whether a substitute value is calculated.
Connected systems
Grid control system
meter data management
ERP
Operations
Deployment model
Data processing
Responsible teams
How quickly is the Redispatch Agent ready to use?
Where is the data processed?
Where does the figure “40% faster case handling” come from?
All agents
15%
higher efficiency
Plant operations, engineering
50%
less reporting effort
Sustainability, management
60%
fewer corrections
EEG, Billing
45%
less evidence effort
Metering point operations, regulation
40%
fewer delivery delays
Purchasing, dispatch, production
60%
less preparation time
Executive board, management