Bring mandatory cases to one cut-off date
Cut-off date 30 September, 62,410 mandatory cases in 3 groups
Energy
By the time someone pulls them together, the shortfall is a guess.Open agent
Enlarge demo
Developed in Germany · Hosted in the EU or on-premises
Delivered together with
Installation figures sit with metering point operations, mandatory cases in the meter inventory, appointments with the installation contractor and exceptions in a network controlling spreadsheet. To get the quota, someone has to bring these four data sets to the same cut-off date. Anyone who does that only at quarter-end only sees the shortfall once three months' worth of installations are already missing.
62,410
mandatory cases
At the 30 September cut-off date, the meter inventory lists 62,410 metering points subject to mandatory installation.
3
mandatory groups
Each group has its own quota stage with its own deadline and is calculated separately.
3,480
missing installations
In the group above 6,000 kWh, 3,480 installations are missing for the stage due on 31 December.
12 weeks
between consolidations
Until the four data sets are brought to one date again, every evidence figure is an estimate.
At the 30 September cut-off date, the quota for each mandatory group is available with the origin of every figure, the shortfall report comes from the same consolidation, and evidence effort falls by 45%.
The 45% reduction in evidence effort is this agent's headline figure. The mandatory cases, group sizes and the twelve weeks between consolidations reflect a typical process in metering point operations; they are not survey data.
Metering point operations plans which metering point is fitted next; the agent calculates the installation quota against the statutory timetable and shows the shortfall for each mandatory group.
Cut-off date 30 September, 62,410 mandatory cases in 3 groups
Group above 6,000 kWh: 3,480 installations missing by 31 December
rollout_meldung_Q3.xlsx, 3 mandatory groups, origin of each figure stated
It presents the shortfall report with quota and gap. Anything for the authority goes through the head of network management.
It names the gap of 3,480 installations in the group above 6,000 kWh. Metering point operations and the installation contractor decide how the installation rounds are planned.
It takes the exception from the metering point operations list, with date and reason. If nobody enters it there, the metering point counts as an open mandatory case in the quota.
Connected systems
Meter and device management
smart meter gateway administration
network controlling reporting
Operations
Deployment model
Data processing
Responsible teams
How quickly is the Smart Meter Rollout Agent ready to use?
Where is the data processed?
Where does the figure “45% less evidence effort” come from?
All agents
50%
less reporting effort
Sustainability, management
40%
fewer delivery delays
Purchasing, dispatch, production
70%
less reporting effort
Network management, controlling
60%
less research time
Regulatory management, legal, network operations
50%
less evidence effort
Information security, executive management, legal
40%
faster case handling
Grid operations, control centre