Screen the week's publications
Calendar week 37, 11 documents across 8 proceedings
Energy
You only find out which two after reading them all.Open agent
Enlarge demo
Developed in Germany · Hosted in the EU or on-premises
Delivered together with
Determinations, consultations and notices appear throughout the week. The regulatory management specialist reads every document, looks for the passages that touch network charges, metering or connection conditions, and turns them into the weekly status report for management. If one proceeding swallows a whole week, everything else slips into the next.
8
ongoing proceedings
Determinations and consultations run at the same time, independently of each other.
140 pages
per week
Decisions, annexes and consultation documents arrive throughout the week.
2
affect the company
The rest does not touch network charges, metering or connections on this network.
4 hours
for the weekly status report
Reading, collecting references, explaining the relevance, writing the report.
60% less research time means the hours no longer spent on the six proceedings that do not affect your own network at all.
The 60% reduction in research time is this agent's headline figure. Eight proceedings and 140 pages a week describe a typical week in regulatory management; they are not measured figures.
Regulatory management writes the comments to the authority; the agent tracks the ongoing proceedings, explains, with a reference, how your own network is affected and reports what needs reviewing.
Calendar week 37, 11 documents across 8 proceedings
Network charges proceeding, margin number 47, relevance explained
regulierungslage_KW37.pdf, 2 proceedings needing review, deadline 9 October
It compiles references and review needs. Regulatory management drafts and signs the text sent to the authority.
It cites the margin number and names what it may affect on your own network. The legal department makes the legal assessment.
If review work comes from a state regulatory authority or an industry association process, the specialist adds it to the weekly report themselves.
Connected systems
Federal Network Agency proceedings pages
document management
regulatory deadline calendar
Operations
Deployment model
Data processing
Responsible teams
How quickly is the Regulatory Radar Agent ready to use?
Where is the data processed?
Where does the figure “60% less research time” come from?
All agents
50%
less evidence effort
Information security, executive management, legal
50%
less reporting effort
Sustainability, management
70%
less reporting effort
Network management, controlling
45%
less evidence effort
Metering point operations, regulation
40%
fewer delivery delays
Purchasing, dispatch, production
60%
less preparation time
Executive board, management