By the time the monthly report is ready, half the figures are four weeks old.

Aggregates grid, load and consumption data for management reports.

Aggregates grid, load and consumption data for management reports.

Open agent

Enlarge demo

Public administration

Four processes that take up the most time today

Developed in Germany · Hosted in the EU

Developed in Germany · Hosted in the EU or on-premises

Delivered together with

Sovereign hosting in Germany, single-tenant from the first user.

Sovereign hosting in Germany, single-tenant from the first user.

Legal, tax and compliance expertise for legally sound deployment.

Legal, tax and compliance expertise for legally sound deployment.

Advisory and implementation for the public sector, starting with the AI readiness assessment.

Advisory and implementation for the public sector, starting with the AI readiness assessment.

Nine sources, one workbook, three days to the first draft.

On the third working day, network controlling starts exporting from the control system, ERP and controlling system. The values are copied into the monthly workbook, formulas extended and signs checked. When management asks what caused an outlier, the search goes back to the source the figure came from.

9

data sources

The control system, ERP and controlling system deliver in three different formats.

14

KPIs in the report

From network availability to maintenance costs per route.

3

days to the draft

Export, assembly and reconciliation fill the time between working day three and working day five.

2

queries from management

Each one leads back into the source file and costs another half day.

Fourteen KPIs from nine sources plus two queries add up to the four days the close costs network controlling every month, and that is exactly what the 70% reduction in reporting effort targets.

The 70% reduction in reporting effort is this agent's headline figure. The number of sources, the range of KPIs and the queries reflect a normal monthly close in network controlling and were not measured.

Three steps through the process.

The head of network management judges what the figures mean; the agent brings together grid, load and cost figures, calculates the KPIs from them and names outliers with their source.

1.

1.

Bring the sources to one reporting date

The agent pulls the values from the control system, ERP and controlling system and brings them to the same reporting date. Where an export is older, it notes its date.

The agent pulls the values from the control system, ERP and controlling system and brings them to the same reporting date. Where an export is older, it notes its date.

Reporting month September 2026, 9 sources, 1 export dated 28 September

2.

2.

Calculate KPIs against the previous month

The agent calculates the fourteen KPIs and sets them alongside the previous month and the same month last year. It flags notable variances with the source the value comes from.

The agent calculates the fourteen KPIs and sets them alongside the previous month and the same month last year. It flags notable variances with the source the value comes from.

SAIDI contribution September 2.7 minutes against 0.4 minutes in August, medium-voltage cable fault on the North route

3.

3.

Present the management briefing for sign-off

The agent writes the summary with the three largest variances, each with figure, comparison value and reference. The head of network management signs off and adds the assessment.

The agent writes the summary with the three largest variances, each with figure, comparison value and reference. The head of network management signs off and adds the assessment.

netzreport_2026-09.pdf, 14 KPIs, 3 flagged variances

What the agent does not do.

It does not assess the variance.

It does not assess the variance.

It gives the figure, comparison value and source. The head of network management decides whether action is needed.

It does not change any figure in the source system.

It does not change any figure in the source system.

If it spots an obviously wrong value, it flags it in the report. Network controlling makes the correction at source, and the report then runs again.

Anything not yet posted at month end does not appear in its figures.

Anything not yet posted at month end does not appear in its figures.

If the civil engineering contractor's invoice for the North route is still in the approval process on 30 September, it is missing from that month's maintenance costs. It shows the posting status; network controlling decides whether to add it later.

Connected systems

Network control system

ERP

controlling system

Operations

Deployment model

EU cloud or private cloud

EU cloud or private cloud

Data processing

GDPR-compliant, no model training on your data

GDPR-compliant, no model training on your data

Responsible teams

Network management, controlling

Network management, controlling

The questions that come up before the first meeting.

How quickly is the Network Reporting Agent ready to use?

Where is the data processed?

Where does the figure “70% less reporting effort” come from?

Related agents.

All agents

Platform

Industries

Services

Resources

Company

Pricing

From AI strategy to a running platform: we show you the way.

Talk to us

Log in

DE

EN

English

Platform

Industries

Services

Resources

Company

Pricing

From AI strategy to a running platform: we show you the way.

Talk to us

Log in

DE

EN

English
neuland.ai

The AI management and orchestration platform from Cologne.

Developed in Cologne. Operated in the EU or in your data center.

Certifications and compliance: ISO 27001, ISO 9001, GDPR, EU AI Act, DORA, StBerG, and BRAO
WirtschaftsWoche Best of Technology 2026 seal, 2nd place in the Process Management category for neuland.ai

© 2026 neuland AI AG