Bring the sources to one reporting date
Reporting month September 2026, 9 sources, 1 export dated 28 September
Energy
half the figures are four weeks old.Open agent
Enlarge demo
Developed in Germany · Hosted in the EU or on-premises
Delivered together with
On the third working day, network controlling starts exporting from the control system, ERP and controlling system. The values are copied into the monthly workbook, formulas extended and signs checked. When management asks what caused an outlier, the search goes back to the source the figure came from.
9
data sources
The control system, ERP and controlling system deliver in three different formats.
14
KPIs in the report
From network availability to maintenance costs per route.
3
days to the draft
Export, assembly and reconciliation fill the time between working day three and working day five.
2
queries from management
Each one leads back into the source file and costs another half day.
Fourteen KPIs from nine sources plus two queries add up to the four days the close costs network controlling every month, and that is exactly what the 70% reduction in reporting effort targets.
The 70% reduction in reporting effort is this agent's headline figure. The number of sources, the range of KPIs and the queries reflect a normal monthly close in network controlling and were not measured.
The head of network management judges what the figures mean; the agent brings together grid, load and cost figures, calculates the KPIs from them and names outliers with their source.
Reporting month September 2026, 9 sources, 1 export dated 28 September
SAIDI contribution September 2.7 minutes against 0.4 minutes in August, medium-voltage cable fault on the North route
netzreport_2026-09.pdf, 14 KPIs, 3 flagged variances
It gives the figure, comparison value and source. The head of network management decides whether action is needed.
If it spots an obviously wrong value, it flags it in the report. Network controlling makes the correction at source, and the report then runs again.
If the civil engineering contractor's invoice for the North route is still in the approval process on 30 September, it is missing from that month's maintenance costs. It shows the posting status; network controlling decides whether to add it later.
Connected systems
Network control system
ERP
controlling system
Operations
Deployment model
Data processing
Responsible teams
How quickly is the Network Reporting Agent ready to use?
Where is the data processed?
Where does the figure “70% less reporting effort” come from?
All agents
50%
less reporting effort
Sustainability, management
60%
less preparation time
Executive board, management
15%
higher efficiency
Plant operations, engineering
45%
less evidence effort
Metering point operations, regulation
60%
less research time
Regulatory management, legal, network operations
40%
fewer delivery delays
Purchasing, dispatch, production