Check documents against the requirements list
Request NA-2026-3187, 10 of 12 documents mapped, storage data sheet and site plan outstanding
Energy
One sheet is missing.Open agent
Enlarge demo
Developed in Germany · Hosted in the EU or on-premises
Delivered together with
The request comes in through the grid connection portal, with data sheets, a site plan and the power rating. The specialist checks whether all the required documents are there, compares the registered power with the free capacity of the local substation and coordinates with grid planning where needed. If a sheet is missing, the whole sequence starts again once the missing document has been requested.
12
required documents
Data sheets, a site plan and the power rating make up a complete request.
2
missing sheets
The data sheet for the storage system and the site plan showing the service connection box are not included.
15
days per request for documents
That is how long the case sits until the missing document comes back.
3
parties per round
The grid connection specialist, grid planning and the connecting party coordinate again after every request for documents.
The agent names both missing sheets on the day the request arrives, the request for documents goes out once instead of twice, and the connection request gets through the review 50% faster.
The 50% faster processing is this agent's headline figure. The number of documents, the wait per request and the three parties reflect a typical grid connection process; they were not counted.
The grid connection specialist signs the approval. Before that, the agent has done the checking and the arithmetic: it checks the submitted documents for completeness, compares the registered power with the recorded capacity and presents the draft decision.
Request NA-2026-3187, 10 of 12 documents mapped, storage data sheet and site plan outstanding
30 kVA registered, Ringstraße substation with 18 kVA free, shortfall 12 kVA
entwurf_NA-2026-3187.pdf, 12 review items, 2 outstanding documents
It presents the review status and capacity calculation. The grid connection specialist signs the approval.
It names the data sheet and site plan as outstanding items in the draft. The case officer sends the letter to the connecting party.
If the Ringstraße substation is 12 kVA short, it records the shortfall with its reference. Whether a transformer is replaced or a cable laid, grid planning decides.
Connected systems
Grid connection portal
GIS network documentation
ERP
Operations
Deployment model
Data processing
Responsible teams
How quickly is the Grid Connection Agent ready to use?
Where is the data processed?
Where does the figure “50% faster processing” come from?
All agents
50%
less manual review effort
Billing, network operators
15%
higher efficiency
Plant operations, engineering
60%
faster processing
Service centre, customer service
60 to 75%
less data entry effort
Grid services, customer service
up to 70%
less manual routing effort
Customer service, back office
55%
faster processing
Grid services, customer service, grid connection