Grid Connection Agent

It is not the technology that holds up the request. One sheet is missing.

Supports the review and documentation of grid connection applications.

Supports the review and documentation of grid connection applications.

Open agent

Enlarge demo

Public administration

Four processes that take up the most time today

Developed in Germany · Hosted in the EU

Developed in Germany · Hosted in the EU or on-premises

Delivered together with

Sovereign hosting in Germany, single-tenant from the first user.

Sovereign hosting in Germany, single-tenant from the first user.

Legal, tax and compliance expertise for legally sound deployment.

Legal, tax and compliance expertise for legally sound deployment.

Advisory and implementation for the public sector, starting with the AI readiness assessment.

Advisory and implementation for the public sector, starting with the AI readiness assessment.

A connection request with twelve required documents, two of them missing.

The request comes in through the grid connection portal, with data sheets, a site plan and the power rating. The specialist checks whether all the required documents are there, compares the registered power with the free capacity of the local substation and coordinates with grid planning where needed. If a sheet is missing, the whole sequence starts again once the missing document has been requested.

12

required documents

Data sheets, a site plan and the power rating make up a complete request.

2

missing sheets

The data sheet for the storage system and the site plan showing the service connection box are not included.

15

days per request for documents

That is how long the case sits until the missing document comes back.

3

parties per round

The grid connection specialist, grid planning and the connecting party coordinate again after every request for documents.

The agent names both missing sheets on the day the request arrives, the request for documents goes out once instead of twice, and the connection request gets through the review 50% faster.

The 50% faster processing is this agent's headline figure. The number of documents, the wait per request and the three parties reflect a typical grid connection process; they were not counted.

Three steps through the process.

The grid connection specialist signs the approval. Before that, the agent has done the checking and the arithmetic: it checks the submitted documents for completeness, compares the registered power with the recorded capacity and presents the draft decision.

1.

1.

Check documents against the requirements list

The agent opens every submitted file and maps it to a required document. It names each one still outstanding.

The agent opens every submitted file and maps it to a required document. It names each one still outstanding.

Request NA-2026-3187, 10 of 12 documents mapped, storage data sheet and site plan outstanding

2.

2.

Compare registered power with capacity

The agent reads the power rating from the data sheet and compares it with the free capacity of the local substation recorded in the network system. If the capacity is not enough, it records the shortfall.

The agent reads the power rating from the data sheet and compares it with the free capacity of the local substation recorded in the network system. If the capacity is not enough, it records the shortfall.

30 kVA registered, Ringstraße substation with 18 kVA free, shortfall 12 kVA

3.

3.

Hand the draft decision to the specialist

The agent puts the review status, capacity calculation and outstanding documents together in a draft. The grid connection specialist signs or passes the case to grid planning.

The agent puts the review status, capacity calculation and outstanding documents together in a draft. The grid connection specialist signs or passes the case to grid planning.

entwurf_NA-2026-3187.pdf, 12 review items, 2 outstanding documents

What the agent does not do.

It does not approve the connection.

It does not approve the connection.

It presents the review status and capacity calculation. The grid connection specialist signs the approval.

It does not request the missing document itself.

It does not request the missing document itself.

It names the data sheet and site plan as outstanding items in the draft. The case officer sends the letter to the connecting party.

It does not plan grid expansion.

It does not plan grid expansion.

If the Ringstraße substation is 12 kVA short, it records the shortfall with its reference. Whether a transformer is replaced or a cable laid, grid planning decides.

Connected systems

Grid connection portal

GIS network documentation

ERP

Operations

Deployment model

EU cloud or private cloud

EU cloud or private cloud

Data processing

GDPR-compliant, no model training on your data

GDPR-compliant, no model training on your data

Responsible teams

Grid planning, engineering

Grid planning, engineering

The questions that come up before the first meeting.

How quickly is the Grid Connection Agent ready to use?

Where is the data processed?

Where does the figure “50% faster processing” come from?

Related agents.

All agents

Platform

Industries

Services

Resources

Company

Pricing

From AI strategy to a running platform: we show you the way.

Talk to us

Log in

DE

EN

English

Platform

Industries

Services

Resources

Company

Pricing

From AI strategy to a running platform: we show you the way.

Talk to us

Log in

DE

EN

English
neuland.ai

The AI management and orchestration platform from Cologne.

Developed in Cologne. Operated in the EU or in your data center.

Certifications and compliance: ISO 27001, ISO 9001, GDPR, EU AI Act, DORA, StBerG, and BRAO
WirtschaftsWoche Best of Technology 2026 seal, 2nd place in the Process Management category for neuland.ai

© 2026 neuland AI AG