Assign the enquiry to a request type
Enquiry SC-40922, request type instalment adjustment, contract account 6100482
Energy
The answer is in three other systems.Open agent
Enlarge demo
Developed in Germany · Hosted in the EU or on-premises
Delivered together with
The enquiry arrives through the customer portal or as an email in the service inbox and names neither contract account nor metering point. The adviser looks up the customer in the CRM, opens the last annual statement and checks tariff and meter reading. Only then does she start writing the reply the customer will eventually read.
310
enquiries a day
Portal, service inbox and callback requests land in the same queue.
7
request types
From adjusting instalments to questions about connecting a wallbox.
3
systems per enquiry
CRM, billing and tariff data are opened before the first sentence is written.
11
minutes of searching
That is how long gathering the facts takes; the reply itself is written in four minutes.
Here, 60% faster processing means that tariff, consumption and the last annual statement are already alongside the enquiry when the adviser opens it, and the eleven minutes of searching disappear.
The 60% speed-up in processing is this agent's headline figure. Enquiry volume, request types and the minutes per case describe a typical day in the service centre; they were not measured here.
The agent handles the enquiry up to the point of sending: it assigns it to a request type, gathers the contract context and drafts the reply. Sending, and every question of goodwill or payment by instalments, remain with the energy customer advisers.
Enquiry SC-40922, request type instalment adjustment, contract account 6100482
Instalment up from 89 to 128 euros, consumption up from 3,410 to 4,190 kWh, tariff change on 1 January 2026
antwort_SC-40922.docx, 3 evidenced values, 1 open point on the meter reading
It saves the draft on the case in the CRM. It is read, amended and sent by the energy customer advisers.
It calculates the amount that follows from consumption and tariff. The adjustment in the billing system is made by customer service.
If the customer asks about a 22 kW wallbox, it passes the enquiry to the grid connection specialist and records the status on the case. The technical answer comes from grid planning.
Connected systems
CRM
billing system
customer portal
Operations
Deployment model
Data processing
Responsible teams
How quickly is the Energy Customer Service Agent ready to use?
Where is the data processed?
Where does the figure “60% faster processing” come from?
All agents
50%
less manual review effort
Billing, network operators
50%
faster processing
Grid planning, engineering
15%
higher efficiency
Plant operations, engineering
up to 65%
less handling time
Customer service, billing
50%
less handling time
Customer service, sales
60%
fewer follow-up queries
Customer service, heat sales, municipal account management