Match the address to the designated area
Lindenweg 12, area W-3, heat network review area, plan sheet 7
Energy
The map does not answer their question.Open agent
Enlarge demo
Developed in Germany · Hosted in the EU or on-premises
Delivered together with
The heat plan exists as a set of maps with area categories and an expansion timetable. On the phone, the adviser has to find the address in the cadastre, read off the category, look up the timetable for that area and then explain what it means for the owner and what it does not. Each of these four steps sits in a different document.
4
steps per call
Find the address, read off the category, look up the timetable, explain how binding it is.
9 minutes
call length
That is how long an enquiry takes when all four steps happen during the call.
240
enquiries a month
That is how many owner questions have come in every month since the plan was published.
36 hours
advice time a month
240 enquiries at nine minutes each tie up customer advice for more than four working days.
If the very first sentence already gives the answer for the address, with category, timetable and context, 60% of follow-up queries disappear.
The 60% reduction in follow-up queries is this agent's headline figure. The number of enquiries and the call length describe the rush a customer advice team sees once the heat plan is published; nobody counted it.
For an address, the agent states the designated area, the expansion timetable and how binding they are; it does not promise a connection.
Lindenweg 12, area W-3, heat network review area, plan sheet 7
Feasibility study by 2028, construction from 2031 at the earliest, plan sheet 7
auskunft_lindenweg12.pdf, 1 page, 3 references from the plan
It reports what the plan sets out for the area and adds that this creates no entitlement. The municipality decides with the utility whether and when to build.
It explains which area the house is in. Which heating system pays off for Lindenweg 12 is for the owner to work out with an energy adviser and installers.
If the council adopts a revised area boundary, it keeps reporting the version on plan sheet 7 until the update is entered. The status date tells the customer adviser which version they are looking at.
Connected systems
Geographic information system
CRM system
customer service portal
Operations
Deployment model
Data processing
Responsible teams
How quickly is the Heat Planning Enquiry Agent ready to use?
Where is the data processed?
Where does the figure “60% fewer follow-up queries” come from?
All agents
up to 65%
less handling time
Customer service, billing
60%
faster processing
Service centre, customer service
up to 70%
less manual routing effort
Customer service, back office
50%
less handling time
Customer service, sales
50%
less manual review effort
Billing, network operators
50%
faster processing
Grid planning, engineering