Energy

Grid Connection Guide Agent

The specialist only sees what is missing when opening the request. Until the customer replies, the case stands still.

Handles connection requests for wallboxes, heat pumps and PV end to end.

Handles connection requests for wallboxes, heat pumps and PV end to end.

Open agent

Enlarge demo

Public administration

Four processes that take up the most time today

Developed in Germany · Hosted in the EU

Developed in Germany · Hosted in the EU or on-premises

Delivered together with

Sovereign hosting in Germany, single-tenant from the first user.

Sovereign hosting in Germany, single-tenant from the first user.

Legal, tax and compliance expertise for legally sound deployment.

Legal, tax and compliance expertise for legally sound deployment.

Advisory and implementation for the public sector, starting with the AI readiness assessment.

Advisory and implementation for the public sector, starting with the AI readiness assessment.

One missing detail on the form holds up the case for eleven days.

The request arrives at grid services, the specialist opens it and finds that the meter number or the device data sheet is missing. She writes to the connecting party, sets a follow-up date and moves on to the next case. When the reply arrives, she has to get back into the case from scratch.

9

mandatory details

Meter number, connection address, power rating, device data sheet and other fields belong in every request.

1

missing detail

The request for the heat pump lacks the data sheet with its electrical power rating.

11 days

waiting time

That is how long the case sits between the query and the connecting party's reply.

3

times the same request is opened

On receipt, at the query and on picking it up again after the reply, someone has to read up on it afresh each time.

The case is opened once rather than three times, because the missing mandatory detail is already in the letter on the day of receipt, and processing is 55% faster.

The 55% is this agent's headline figure. The number of mandatory details, the waiting time and the times the case is opened reflect a typical process in grid services and do not come from a measurement.

Three steps through the process.

The grid connection specialist signs the connection approval; the agent captures the request in full and assigns it to a connection case.

1.

1.

Check the request for mandatory details

The agent reads the incoming request and checks it against the nine mandatory details. It names each missing field.

The agent reads the incoming request and checks it against the nine mandatory details. It names each missing field.

Request NA-2027-3308, 8 of 9 mandatory details provided

2.

2.

Classify the connection case by device and power

The agent assigns the request to the right connection case by device and requested power and checks whether it falls under the requirements for digital connection procedures. The classification and its reasoning are recorded on the case.

The agent assigns the request to the right connection case by device and requested power and checks whether it falls under the requirements for digital connection procedures. The classification and its reasoning are recorded on the case.

Heat pump 11 kW, classified as a controllable consumption device

3.

3.

Create the case with a request for the missing details

The agent creates the case in the network information system and attaches the letter naming the one outstanding detail. The grid connection specialist approves it.

The agent creates the case in the network information system and attaches the letter naming the one outstanding detail. The grid connection specialist approves it.

nachforderung_na-2027-3308.pdf, 1 outstanding detail, heat pump data sheet

What the agent does not do.

It does not approve a grid connection.

It does not approve a grid connection.

It presents the captured case with its classification and the outstanding detail. The grid connection specialist signs the approval.

It does not recalculate capacity in the local grid.

It does not recalculate capacity in the local grid.

It records the requested power and the connection address. *Grid planning checks in the network calculation software whether the feeder can carry the heat pump.*

It does not send letters to the connecting party.

It does not send letters to the connecting party.

The draft naming the outstanding detail is attached to case NA-2027-3308. Grid services decides whether and when it goes out.

Connected systems

Grid connection portal

network information system

geographic information system

Operations

Deployment model

EU cloud or private cloud

EU cloud or private cloud

Data processing

GDPR-compliant, no model training on your data

GDPR-compliant, no model training on your data

Responsible teams

Grid services, customer service, grid connection

Grid services, customer service, grid connection

The questions that come up before the first meeting.

How quickly is the Grid Connection Guide Agent ready to use?

Where is the data processed?

Where does the figure “55% faster processing” come from?

Related agents.

All agents

Platform

Industries

Services

Resources

Company

Pricing

From AI strategy to a running platform: we show you the way.

Talk to us

Log in

DE

EN

English

Platform

Industries

Services

Resources

Company

Pricing

From AI strategy to a running platform: we show you the way.

Talk to us

Log in

DE

EN

English
neuland.ai

The AI management and orchestration platform from Cologne.

Developed in Cologne. Operated in the EU or in your data center.

Certifications and compliance: ISO 27001, ISO 9001, GDPR, EU AI Act, DORA, StBerG, and BRAO
WirtschaftsWoche Best of Technology 2026 seal, 2nd place in the Process Management category for neuland.ai

© 2026 neuland AI AG