Check the request for mandatory details
The agent reads the incoming request and checks it against the nine mandatory details. It names each missing field.
Request NA-2027-3308, 8 of 9 mandatory details providedHandles connection requests for wallboxes, heat pumps and PV end to end.
Developed in Germany · Hosted in the EU or on-premises
Delivered together with
The request arrives at grid services, the specialist opens it and finds that the meter number or the device data sheet is missing. She writes to the connecting party, sets a follow-up date and moves on to the next case. When the reply arrives, she has to get back into the case from scratch.
The case is opened once rather than three times, because the missing mandatory detail is already in the letter on the day of receipt, and processing is 55% faster.
The 55% is this agent's headline figure. The number of mandatory details, the waiting time and the times the case is opened reflect a typical process in grid services and do not come from a measurement.
The agent reads the incoming request and checks it against the nine mandatory details. It names each missing field.
Request NA-2027-3308, 8 of 9 mandatory details providedThe agent assigns the request to the right connection case by device and requested power and checks whether it falls under the requirements for digital connection procedures. The classification and its reasoning are recorded on the case.
Heat pump 11 kW, classified as a controllable consumption deviceThe agent creates the case in the network information system and attaches the letter naming the one outstanding detail. The grid connection specialist approves it.
nachforderung_na-2027-3308.pdf, 1 outstanding detail, heat pump data sheetIt presents the captured case with its classification and the outstanding detail. The grid connection specialist signs the approval.
It records the requested power and the connection address. *Grid planning checks in the network calculation software whether the feeder can carry the heat pump.*
The draft naming the outstanding detail is attached to case NA-2027-3308. Grid services decides whether and when it goes out.
Connected systems
Operations
A pilot typically runs on your own data within 6 to 8 weeks. The agent connects to your existing systems rather than running as a separate, parallel environment.
EU cloud or private cloud. Processing is GDPR-compliant and models are never trained on your data. Details in the Trust Center.
It is based on experience from comparable projects and process benchmarks, not a commitment. We work out the realistic effect for your organisation during the assessment before the pilot.