Gather evidence from three repositories
Evidence list for the audit on 12 November, 41 of 48 clauses backed
Industry
Nobody knows which repository it is in.Open agent
Enlarge demo
Developed in Germany · Hosted in the EU or on-premises
Delivered together with
The quality manager works through the clauses of the standard one by one, looking for the matching record for each. Test records sit in the QMS, supplier approvals are attached to documents in the ERP, work instructions in the DMS. Because policies changed between audits, he also has to establish which version applied in the audit period.
1
audit notice
The certification body announces the surveillance audit for 12 November.
48
clauses of the standard
For every clause, evidence must be ready to present in the audit.
3
repositories
The records are spread across QMS, ERP and DMS.
9
amended instructions
For nine work instructions it also has to be established which version applied in the audit period.
On the first day of preparation, the quality manager picks up the finished evidence list for all 48 clauses. With 50% less audit preparation, only the seven open points remain, and he closes them in the weeks before 12 November.
The 50% reduction in audit preparation is this agent's headline figure. The 48 clauses and the nine amended work instructions reflect the usual scope of a surveillance audit; nothing was counted here.
The agent collects the evidence and assigns it to the clauses of the standard; the quality manager decides whether a piece of evidence satisfies the standard.
Evidence list for the audit on 12 November, 41 of 48 clauses backed
9 amended instructions, version status shown for the audit period 1 January to 31 October
auditordner_ueberwachung_1211.pdf, 48 clauses, 7 open points with references
It matches the records and names the reference for each. The quality manager decides what is presented in the audit.
It sets clause, record and reference side by side. Whether the record is sufficient is the quality manager's decision, and where a product approval is affected, he brings in the regulatory affairs specialist.
As long as an instruction is not captured in the DMS, it lists the related clause as open. The quality manager has to add it by hand.
Connected systems
QMS
ERP
DMS
Operations
Deployment model
Data processing
Responsible teams
How quickly is the Industrial Compliance Agent ready to use?
Where is the data processed?
Where does the figure “50% less audit preparation” come from?
All agents
40%
less documentation effort
Quality assurance, quality manager
60%
less preparation time
Executive board, COO
40%
faster research cycles
Strategy, Product Development
55%
less research time
Engineering, planning, quality management
50%
less evidence effort
Quality management, engineering
60%
less reading time
Engineering, quotation management