Assign components to categories
Bill of materials BG-3062, 34 components, 5 requirement sets, 1 reference each
Industry
Only the colleague who handled it back then knows where it is.Open agent
Enlarge demo
Developed in Germany · Hosted in the EU or on-premises
Delivered together with
The assembly consists of bought-in parts and in-house production, and each category carries a different set of requirements. The evidence is spread across test certificates in the CAQ system, declarations in document management and documents held by the supplier. It is gathered shortly before delivery, and any gap only comes to light when the customer points it out.
34
components
The assembly contains bought-in parts and in-house production side by side.
5
requirement sets
Depending on the component's category, a different set of evidence applies.
58
required items of evidence
Components and categories add up to this number of individual documents.
11
missing documents
They are held by the supplier and have to be requested one by one.
The dossier for the assembly takes 50% less evidence effort, and all the head of quality has left to clear before release are eleven documents, each with part number and supplier.
The 50% reduction in evidence effort is this agent's headline figure. The 58 individual documents from 34 components and five requirement sets reflect a typical assembly; they were not counted for this page.
The agent compiles the dossier; the head of quality releases it and also rules on contested interpretations.
Bill of materials BG-3062, 34 components, 5 requirement sets, 1 reference each
47 of 58 items of evidence found, oldest document a test certificate from 2021
Draft dossier with 47 documents, gap list with 11 items
It compiles the dossier and shows the gaps. Release for delivery is signed off by the head of quality.
It places requirement and document side by side and flags the doubtful cases. Interpretation is for quality management.
A test certificate that went to purchasing by email and was never filed in document management is listed as a gap. Procurement requests it.
Connected systems
CAQ system
document management
bill of materials system
Operations
Deployment model
Data processing
Responsible teams
How quickly is the Conformity Navigator Agent ready to use?
Where is the data processed?
Where does the figure “50% less evidence effort” come from?
All agents
50%
less audit preparation
Quality manager, management
60%
less reading time
Engineering, quotation management
55%
less research time
Engineering, planning, quality management
up to 60%
less knowledge loss
Service, HR, knowledge management
60%
less preparation time
Executive board, COO
40%
faster research cycles
Strategy, Product Development