Extract the requirements from the specification
340 requirements from 118 pages, each with chapter and page number
Industry
Only one of them finds the evidence requirement on page 88.Open agent
Enlarge demo
Developed in Germany · Hosted in the EU or on-premises
Delivered together with
The specification arrives as a PDF with appendices, and the requirements are spread across running text, tables and references to applicable standards. Each reader marks by instinct what will take effort and what the portfolio covers. What ends up costing money is the one requirement with an evidence obligation that was never priced into the quotation.
340
requirements
They are scattered across the specification in running text, tables and references.
3
readers
Three engineers split the document between them by chapter.
26
evidence requirements
They call for a test certificate, a declaration or a sample approval.
4
days of reading
That is how long the first pass takes before costing begins.
The 60% cut in reading time is won in the first pass, because every requirement that needs evidence is already flagged there with its page number.
The 60% reduction in reading time is this agent's headline figure. 26 evidence requirements among 340 is a typical ratio for a specification of this size; the ratio was not counted.
The agent extracts the requirements from the specification and flags the ones that need evidence; engineering checks whether the estimated effort holds up before submission.
340 requirements from 118 pages, each with chapter and page number
26 evidence requirements, 4 of them material certificates under Appendix C
Requirements list LH-2026-072, 61 effort suggestions with references
It categorises and backs each call with a reference. Which effort goes into the quotation is the responsibility of engineering together with quotation management.
It places requirement text and portfolio data side by side and flags where they diverge. Whether the product meets it is for the relevant department to say.
If chapter 9 refers to one of the customer's in-house standards that was not sent, it lists the requirement as open with a note on the missing appendix.
Connected systems
Requirements management
PLM system
quotation costing
Operations
Deployment model
Data processing
Responsible teams
How quickly is the Requirements Specification Analysis Agent ready to use?
Where is the data processed?
Where does the figure “60% less reading time” come from?
All agents
10 to 20%
cost reduction
Controlling, management
50%
less evidence effort
Quality management, engineering
60%
less preparation time
Executive board, COO
40%
less documentation effort
Quality assurance, quality manager
50%
less audit preparation
Quality manager, management
40%
faster research cycles
Strategy, Product Development