Industry

Product Cost Agent

At month-end the variance is known; the cause only emerges once the quarter is half over.

Analyses production and material costs in real time.

Analyses production and material costs in real time.

Open agent

Enlarge demo

Public administration

Four processes that take up the most time today

Developed in Germany · Hosted in the EU

Developed in Germany · Hosted in the EU or on-premises

Delivered together with

Sovereign hosting in Germany, single-tenant from the first user.

Sovereign hosting in Germany, single-tenant from the first user.

Legal, tax and compliance expertise for legally sound deployment.

Legal, tax and compliance expertise for legally sound deployment.

Advisory and implementation for the public sector, starting with the AI readiness assessment.

Advisory and implementation for the public sector, starting with the AI readiness assessment.

An item's manufacturing costs appear in five reports, and none of them checks the others.

Material prices come from purchasing, set-up and run times from production, overheads from cost accounting. For a comparison, controlling pulls three extracts and builds its own spreadsheet from them. Because each extract has its own cut-off date, the figures are no longer comparable by the time they are merged.

310

items

Each of the 310 items has its own costing.

5

cost types

Material, manufacturing, set-up, scrap and overheads are held separately for each item, and their extracts carry two different cut-off dates.

6 weeks

delay

That is how long it takes to pin down the variance on item 3120-77.

1.80 euros

variance per unit

That is how much more item 3120-77 costs than in the previous month; 1.35 euros of it comes from the price of stainless steel, the rest from set-up and scrap.

Controlling finds the 10 to 20% cost reduction in amounts such as the 0.42 euros of set-up costs per unit, which can still be changed on the third working day by adjusting the batch size.

The 10 to 20% cost reduction is this agent's headline figure. In product cost controlling with 310 items, six weeks to pin down a variance is typical of the month-end close; it was not measured.

Three steps through the process.

The agent tells controlling which cost type a variance comes from, and controlling decides with the specialist department whether to accept it.

1.

1.

Bring the cost types together for each item

The agent brings material prices, production times and overheads to a common cut-off date. It shows the source and date of every value.

The agent brings material prices, production times and overheads to a common cut-off date. It shows the source and date of every value.

310 items as at 31 July, 5 cost types per item, 4 values without a source

2.

2.

Break down the variance against the previous month

The agent compares manufacturing costs with the previous month and splits the difference across the cost types. For each cost type it gives the amount per unit.

The agent compares manufacturing costs with the previous month and splits the difference across the cost types. For each cost type it gives the amount per unit.

Item 3120-77 up 1.80 euros per unit, 1.35 euros of it from the stainless steel price

3.

3.

Prepare scenarios for a decision

The agent works out the effect of batch size, source of supply and scrap quantity on unit costs. Controlling presents the paper to the specialist department.

The agent works out the effect of batch size, source of supply and scrap quantity on unit costs. Controlling presents the paper to the specialist department.

Paper KO-9042 with 3 scenarios, batch size 500 cuts set-up costs by 0.42 euros per unit

What the agent does not do.

It does not change prices in the costing.

It does not change prices in the costing.

It shows the effect of a scenario on unit costs. Controlling sets the new standard costing in the ERP.

It does not forecast market prices.

It does not forecast market prices.

It traces the rise of 1.35 euros per unit for stainless steel back to the purchasing documents. Purchasing judges how the price will develop.

It does not allocate collective postings on a cost centre to individual items.

It does not allocate collective postings on a cost centre to individual items.

It keeps a posted rework charge with no item reference separately under the cost centre. Cost accounting assigns it to the item.

Connected systems

ERP cost accounting

purchasing system

BI reporting

Operations

Deployment model

EU cloud or private cloud

EU cloud or private cloud

Data processing

GDPR-compliant, no model training on your data

GDPR-compliant, no model training on your data

Responsible teams

Controlling, management

Controlling, management

The questions that come up before the first meeting.

How quickly is the Product Cost Agent ready to use?

Where is the data processed?

Where does the figure “10 to 20% cost reduction” come from?

Related agents.

All agents

Platform

Industries

Services

Resources

Company

Pricing

From AI strategy to a running platform: we show you the way.

Talk to us

Log in

DE

EN

English

Platform

Industries

Services

Resources

Company

Pricing

From AI strategy to a running platform: we show you the way.

Talk to us

Log in

DE

EN

English
neuland.ai

The AI management and orchestration platform from Cologne.

Developed in Cologne. Operated in the EU or in your data center.

Certifications and compliance: ISO 27001, ISO 9001, GDPR, EU AI Act, DORA, StBerG, and BRAO
WirtschaftsWoche Best of Technology 2026 seal, 2nd place in the Process Management category for neuland.ai

© 2026 neuland AI AG