Bring the cost types together for each item
310 items as at 31 July, 5 cost types per item, 4 values without a source
Industry
the cause only emerges once the quarter is half over.Open agent
Enlarge demo
Developed in Germany · Hosted in the EU or on-premises
Delivered together with
Material prices come from purchasing, set-up and run times from production, overheads from cost accounting. For a comparison, controlling pulls three extracts and builds its own spreadsheet from them. Because each extract has its own cut-off date, the figures are no longer comparable by the time they are merged.
310
items
Each of the 310 items has its own costing.
5
cost types
Material, manufacturing, set-up, scrap and overheads are held separately for each item, and their extracts carry two different cut-off dates.
6 weeks
delay
That is how long it takes to pin down the variance on item 3120-77.
1.80 euros
variance per unit
That is how much more item 3120-77 costs than in the previous month; 1.35 euros of it comes from the price of stainless steel, the rest from set-up and scrap.
Controlling finds the 10 to 20% cost reduction in amounts such as the 0.42 euros of set-up costs per unit, which can still be changed on the third working day by adjusting the batch size.
The 10 to 20% cost reduction is this agent's headline figure. In product cost controlling with 310 items, six weeks to pin down a variance is typical of the month-end close; it was not measured.
The agent tells controlling which cost type a variance comes from, and controlling decides with the specialist department whether to accept it.
310 items as at 31 July, 5 cost types per item, 4 values without a source
Item 3120-77 up 1.80 euros per unit, 1.35 euros of it from the stainless steel price
Paper KO-9042 with 3 scenarios, batch size 500 cuts set-up costs by 0.42 euros per unit
It shows the effect of a scenario on unit costs. Controlling sets the new standard costing in the ERP.
It traces the rise of 1.35 euros per unit for stainless steel back to the purchasing documents. Purchasing judges how the price will develop.
It keeps a posted rework charge with no item reference separately under the cost centre. Cost accounting assigns it to the item.
Connected systems
ERP cost accounting
purchasing system
BI reporting
Operations
Deployment model
Data processing
Responsible teams
How quickly is the Product Cost Agent ready to use?
Where is the data processed?
Where does the figure “10 to 20% cost reduction” come from?
All agents
60%
less preparation time
Executive board, COO
40%
faster research cycles
Strategy, Product Development
30%
fewer delivery delays
Supply chain, purchasing
60%
less reading time
Engineering, quotation management
55%
faster quotation preparation
Inside sales, costing
50%
less evidence effort
Quality management, engineering