Narrow down the knowledge topics in conversation
Topic list for Line 4, 23 topics, 6 with no entry in the maintenance schedule
Industry
Nobody ever wrote it down.Open agent
Enlarge demo
Developed in Germany · Hosted in the EU or on-premises
Delivered together with
The handover is planned as an overlap period: the experienced line operator is supposed to document what he knows. In everyday work, a breakdown gets in the way, and what ends up recorded is what the maintenance schedule says anyway. The special knowledge, the fault pattern with its three exceptions, stays in his head and leaves with him.
38
years of service
The line operator has known the line since it was commissioned.
12
weeks of handover
That is how long he overlaps with his successor.
6
fault patterns with no entry
They appear in no maintenance schedule, because they occur so rarely.
9
months of onboarding
That is how long the successor needs before he can solve the same cases on his own.
On the last working day, the six fault patterns sit as searchable entries in the knowledge base instead of in the colleague's head: up to 60% less knowledge loss.
The reduction of up to 60% in knowledge loss is this agent's headline figure. The six fault patterns without an entry and the nine months of onboarding sketch a typical handover; nobody counted them.
The experienced colleague decides himself whether each entry is released; the agent asks the questions and puts what he says into shape.
Topic list for Line 4, 23 topics, 6 with no entry in the maintenance schedule
47-minute interview, 6 fault patterns captured with trigger and procedure
6 drafts in the knowledge base, each with 1 plant number and 4 search terms
It presents the draft with the plant reference. Whether it goes into the knowledge base as it stands is for the colleague who described it to sign off.
It records what the colleague describes and marks the passage as experience-based knowledge. The technical assessment is for the head of maintenance.
An auxiliary unit the colleague never mentions never comes up in any interview. Knowledge management decides which topics belong on the list.
Connected systems
Knowledge base
maintenance schedules in the maintenance system
onboarding plan in the HR system
Operations
Deployment model
Data processing
Responsible teams
How quickly is the Expert Knowledge Capture Agent ready to use?
Where is the data processed?
Where does the figure “up to 60% less knowledge loss” come from?
All agents
60%
less preparation time
Executive board, COO
25%
less planning effort
Workforce planning, production
40%
faster research cycles
Strategy, Product Development
45%
faster fault resolution
Service, technical field service
50%
less evidence effort
Quality management, engineering
30%
faster service turnaround
Service, after-sales