Structure the notes by topic
Operations meeting of 12 February 2026, 6 agenda items, 8 participants
Energy
why the decision was made.Open agent
Enlarge demo
Developed in Germany · Hosted in the EU or on-premises
Delivered together with
During the meeting, everyone takes their own notes. Afterwards, one person puts the minutes together, tracks down who owns each task and adds the dates. The decision ends up buried in running text that nobody searches when they need to look something up.
8
participants
Everyone takes notes, and no two sets match.
60 minutes
meeting
Operations meeting with grid, sales and billing.
11
tasks
They sit in the text with no name and no date attached.
55 minutes
follow-up
Compiling the minutes, finding owners, adding dates.
Whoever writes up the operations meeting finds the structure, eleven tasks and three decisions already in front of them, and needs 50% less follow-up time.
The 50% reduction in follow-up time is this agent's headline figure. The number of participants, meeting length, number of tasks and follow-up time describe a typical operations meeting and are not measured values.
From the notes, the agent extracts the structure, tasks with owners and decisions with their reasoning; whoever made a decision remains responsible for it.
Operations meeting of 12 February 2026, 6 agenda items, 8 participants
11 tasks, 9 with name and date, 2 flagged as having no owner
3 decisions filed, entry on 2027 network charges with 2 counter-arguments
It records what was decided and on what grounds. Whoever made the decision remains responsible for it.
The two tasks without an owner stay flagged. The meeting chair decides who takes them on.
It does not appear in the notes, so the agent does not list it as a task. It belongs on the agenda for the next meeting.
Connected systems
Microsoft Teams
SharePoint
task management
Operations
Deployment model
Data processing
Responsible teams
How quickly is the Meeting and Documentation Agent ready to use?
Where is the data processed?
Where does the figure “50% less follow-up time” come from?
All agents
15%
higher efficiency
Plant operations, engineering
45%
faster fault diagnosis
Service, field service
up to 60%
less time spent searching
Engineering, sales, service
60%
less preparation time
Executive board, management
up to 70%
less manual routing effort
Customer service, back office
50%
less manual review effort
Billing, network operators