Industry

Technical Documentation Agent

The assembly has changed, the manual has not. The only link between the two is the technical writer's memory.

Creates structured technical documentation from PLM and CAD data.

Creates structured technical documentation from PLM and CAD data.

Open agent

Enlarge demo

Public administration

Four processes that take up the most time today

Developed in Germany · Hosted in the EU

Developed in Germany · Hosted in the EU or on-premises

Delivered together with

Sovereign hosting in Germany, single-tenant from the first user.

Sovereign hosting in Germany, single-tenant from the first user.

Legal, tax and compliance expertise for legally sound deployment.

Legal, tax and compliance expertise for legally sound deployment.

Advisory and implementation for the public sector, starting with the AI readiness assessment.

Advisory and implementation for the public sector, starting with the AI readiness assessment.

A single dimension change to an assembly ripples through four chapters and three language versions.

Design engineering releases the new revision in the PLM system. Technical writing then hunts down every place where the dimension, the illustration or the spare part appears and updates each one by hand. Translation then has to repeat the same search, and the versions drift apart as soon as another change comes in.

1

revision

Assembly BG-7305 gets a new revision in the PLM system.

4

chapters

Four chapters of the operating manual describe this assembly.

3

language versions

German, English and Polish are currently maintained separately.

12

occurrences

Twelve passages of text and two illustrations still show the old dimension.

At the next revision, the technical writer finds the twelve occurrences already flagged, and 50% faster documentation comes almost entirely from the search she no longer has to do.

The 50% speed-up in documentation is this agent's headline figure. Twelve occurrences across four chapters and three language versions are typical of an ordinary revision in mechanical engineering; they were not measured.

Three steps through the process.

At each revision, the agent shows every passage that no longer matches the design; technical writing judges whether the manual is technically correct.

1.

1.

Map the revision to the chapters

The agent reads the released revision from the PLM system and finds every occurrence in the document structure. It lists the chapter, the section and the type of discrepancy.

The agent reads the released revision from the PLM system and finds every occurrence in the document structure. It lists the chapter, the section and the type of discrepancy.

Revision BG-7305/C, 12 occurrences in 4 chapters, 2 of them illustrations

2.

2.

Check text modules against the bill of materials

The agent compares spare part numbers, dimensions and tightening torques in the text with the current bill of materials from the ERP system. It flags each discrepancy with the old and the new value.

The agent compares spare part numbers, dimensions and tightening torques in the text with the current bill of materials from the ERP system. It flags each discrepancy with the old and the new value.

Tightening torque in chapter 5.3 given as 45 Nm, bill of materials states 52 Nm

3.

3.

File the draft in the technical writing repository

The agent works the changed sections into all three language versions and marks every change. Technical writing checks the content and approves it.

The agent works the changed sections into all three language versions and marks every change. Technical writing checks the content and approves it.

BA-1129-DE in draft, 12 marked changes, EN and PL versions kept in step

What the agent does not do.

It does not approve the manual.

It does not approve the manual.

It files the marked-up draft in the technical writing repository. Technical writing signs off the manual and its dispatch to the customer or plant.

It does not rewrite safety notices.

It does not rewrite safety notices.

It carries over existing warnings unchanged and points out the passages affected. Whether a new notice is needed is for technical writing to settle with design engineering.

It does not touch anything design engineering has not yet released in the PLM system.

It does not touch anything design engineering has not yet released in the PLM system.

If the new revision only exists as a drawing in design engineering's inbox, the old dimension stays in the text. The comparison is triggered only once the revision is released in the PLM system.

Connected systems

PLM system

CAD repository

ERP bills of materials

Operations

Deployment model

EU cloud or private cloud

EU cloud or private cloud

Data processing

GDPR-compliant, no model training on your data

GDPR-compliant, no model training on your data

Responsible teams

Technical writing, product management

Technical writing, product management

The questions that come up before the first meeting.

How quickly is the Technical Documentation Agent ready to use?

Where is the data processed?

Where does the figure “50% faster documentation” come from?

Related agents.

All agents

Platform

Industries

Services

Resources

Company

Pricing

From AI strategy to a running platform: we show you the way.

Talk to us

Log in

DE

EN

English

Platform

Industries

Services

Resources

Company

Pricing

From AI strategy to a running platform: we show you the way.

Talk to us

Log in

DE

EN

English
neuland.ai

The AI management and orchestration platform from Cologne.

Developed in Cologne. Operated in the EU or in your data center.

Certifications and compliance: ISO 27001, ISO 9001, GDPR, EU AI Act, DORA, StBerG, and BRAO
WirtschaftsWoche Best of Technology 2026 seal, 2nd place in the Process Management category for neuland.ai

© 2026 neuland AI AG