Separate findings by trade
The agent reads the inspection report and splits it into individual findings. To each finding it attaches the trade and the page number in the report.
Inspection report PB-2087, 34 findings across 5 tradesDerives the trade, urgency, legal consequence and work order from an inspection finding.
Developed in Germany · Hosted in the EU or on-premises
Delivered together with
The report arrives from the inspection service as a PDF, with the findings listed one after another as running text. For each finding, the property manager determines the trade, estimates the urgency, looks up the legal consequence and writes the work order. The deadline runs from the inspection date, not from the day someone opens the report.
After the first sort, the work orders are ready, grouped by trade and deadline, and defects are resolved 50% faster.
Resolving defects 50% faster is this agent's headline figure. The 34 findings and the eleven working days to the last work order describe a typical run after a routine inspection; none of it was measured.
The agent reads the inspection report and splits it into individual findings. To each finding it attaches the trade and the page number in the report.
Inspection report PB-2087, 34 findings across 5 tradesFor each finding, the agent quotes the deadline stated in the report and the inspector's classification. If a detail is missing, it marks the finding as open.
28 findings with a deadline from the report, 6 marked as having no deadlineThe agent combines the findings for each trade into a draft work order, with the location in the report and a deadline date for every item. Maintenance planning approves the order.
auftragsentwurf_elektro_PB-2087.pdf, 9 items, deadline 30 SeptemberIt presents the draft work order with items, report references and deadline. Maintenance planning signs off the award.
It reproduces the classification from the inspection report verbatim, as a quotation. The technical assessment stays with the expert.
It works with the signed inspection report and the work orders in the CAFM system. Until the supplement is filed there, it treats the finding as it stood in the original report.
Connected systems
Operations
A pilot typically runs on your own data within 4 to 6 weeks. The agent connects to your existing systems rather than running as a separate, parallel environment.
EU cloud or private cloud. Processing is GDPR-compliant and models are never trained on your data. Details in the Trust Center.
It is based on experience from comparable projects and process benchmarks, not a commitment. We work out the realistic effect for your organisation during the assessment before the pilot.