Real estate

Defect to Work Order Agent

The inspection report lists the findings. It does not say which ones are urgent or who they concern.

Derives the trade, urgency, legal consequence and work order from an inspection finding.

Derives the trade, urgency, legal consequence and work order from an inspection finding.

Open agent

Enlarge demo

Public administration

Four processes that take up the most time today

Developed in Germany · Hosted in the EU

Developed in Germany · Hosted in the EU or on-premises

Delivered together with

Sovereign hosting in Germany, single-tenant from the first user.

Sovereign hosting in Germany, single-tenant from the first user.

Legal, tax and compliance expertise for legally sound deployment.

Legal, tax and compliance expertise for legally sound deployment.

Advisory and implementation for the public sector, starting with the AI readiness assessment.

Advisory and implementation for the public sector, starting with the AI readiness assessment.

One line in an inspection report takes four decisions before a tradesperson sets off.

The report arrives from the inspection service as a PDF, with the findings listed one after another as running text. For each finding, the property manager determines the trade, estimates the urgency, looks up the legal consequence and writes the work order. The deadline runs from the inspection date, not from the day someone opens the report.

34

findings

The inspection report for the Nordkai 7 property lists 34 individual findings in no particular order.

5

trades

Electrical, plumbing, fire protection, lifts and roofing share the findings between them.

4

decisions per finding

Trade, urgency, legal consequence and execution are each determined separately.

11

working days

That is how long the report sits until the last work order is written.

After the first sort, the work orders are ready, grouped by trade and deadline, and defects are resolved 50% faster.

Resolving defects 50% faster is this agent's headline figure. The 34 findings and the eleven working days to the last work order describe a typical run after a routine inspection; none of it was measured.

Three steps through the process.

The agent gives each finding a trade, a deadline and its location in the report; maintenance planning decides who gets the job.

1.

1.

Separate findings by trade

The agent reads the inspection report and splits it into individual findings. To each finding it attaches the trade and the page number in the report.

The agent reads the inspection report and splits it into individual findings. To each finding it attaches the trade and the page number in the report.

Inspection report PB-2087, 34 findings across 5 trades

2.

2.

Document the urgency and legal consequence

For each finding, the agent quotes the deadline stated in the report and the inspector's classification. If a detail is missing, it marks the finding as open.

For each finding, the agent quotes the deadline stated in the report and the inspector's classification. If a detail is missing, it marks the finding as open.

28 findings with a deadline from the report, 6 marked as having no deadline

3.

3.

Set up draft work orders per trade

The agent combines the findings for each trade into a draft work order, with the location in the report and a deadline date for every item. Maintenance planning approves the order.

The agent combines the findings for each trade into a draft work order, with the location in the report and a deadline date for every item. Maintenance planning approves the order.

auftragsentwurf_elektro_PB-2087.pdf, 9 items, deadline 30 September

What the agent does not do.

It does not commission the tradesperson.

It does not commission the tradesperson.

It presents the draft work order with items, report references and deadline. Maintenance planning signs off the award.

It does not assess whether a finding affects structural stability.

It does not assess whether a finding affects structural stability.

It reproduces the classification from the inspection report verbatim, as a quotation. The technical assessment stays with the expert.

If the expert adds to a finding after the site visit, it only sees this once the report supplement arrives.

If the expert adds to a finding after the site visit, it only sees this once the report supplement arrives.

It works with the signed inspection report and the work orders in the CAFM system. Until the supplement is filed there, it treats the finding as it stood in the original report.

Connected systems

CAFM system

work order management

document management system

Operations

Deployment model

EU cloud or private cloud

EU cloud or private cloud

Data processing

GDPR-compliant, no model training on your data

GDPR-compliant, no model training on your data

Responsible teams

Technical property management, maintenance

Technical property management, maintenance

The questions that come up before the first meeting.

How quickly is the Defect to Work Order Agent ready to use?

Where is the data processed?

Where does the figure “50% faster defect resolution” come from?

Related agents.

All agents

Platform

Industries

Services

Resources

Company

Pricing

From AI strategy to a running platform: we show you the way.

Talk to us

Log in

DE

EN

English

Platform

Industries

Services

Resources

Company

Pricing

From AI strategy to a running platform: we show you the way.

Talk to us

Log in

DE

EN

English
neuland.ai

The AI management and orchestration platform from Cologne.

Developed in Cologne. Operated in the EU or in your data center.

Certifications and compliance: ISO 27001, ISO 9001, GDPR, EU AI Act, DORA, StBerG, and BRAO
WirtschaftsWoche Best of Technology 2026 seal, 2nd place in the Process Management category for neuland.ai

© 2026 neuland AI AG