Pull the case data from the systems
The agent compiles findings, medication and progress entries for the case. Every detail it carries over keeps the reference to its source.
Case file for case 2026-207341, 27 entries from 3 systemsDrafts discharge letters in line with the current version of the framework agreement.
Developed in Germany · Hosted in the EU or on-premises
Delivered together with
The letter is written at the end, when the case already looks closed. Findings sit in the hospital information system, the medication in the prescription record, the progress notes in the nursing documentation, and the framework agreement requires details from all three. If a mandatory detail is missing, the letter comes back long after the patient has gone home.
The second writing round is no longer needed, because the twelve mandatory details of the version in force are already evidenced or flagged as open in the first draft; documentation time falls by 60%.
The 60% reduction in documentation time is this agent's headline figure. Three source systems and two writing rounds describe a typical discharge day on the ward; nobody counted them.
The agent compiles findings, medication and progress entries for the case. Every detail it carries over keeps the reference to its source.
Case file for case 2026-207341, 27 entries from 3 systemsThe agent checks the draft against the mandatory details of the current version. Missing details are flagged in the text at the place where they belong.
Checklist with 12 mandatory details, 2 of them flagged as openThe agent places the draft, with source references and open items, in the case file. The medical staff then sign it.
entlassbrief_2026-114873_entwurf.docx, 2 pages, 2 open detailsIt uses what is documented in the case and cites the source. The medical staff are responsible for what applies clinically.
entlassbrief_2026-114873_entwurf.docx sits in the case file awaiting signature. When the letter goes to the GP or the next treating clinician is for the ward to decide.
Notes on paper and what was said on the ward round do not reach it. It lists the affected point as an open mandatory detail.
Connected systems
Operations
A pilot typically runs on your own data within 4 to 6 weeks. The agent connects to your existing systems rather than running as a separate, parallel environment.
EU cloud, private cloud or on-premises. Processing is GDPR-compliant and models are never trained on your data. Details in the Trust Center.
It is based on experience from comparable projects and process benchmarks, not a commitment. We establish the realistic effect for your organisation in the assessment before the pilot.