Check completeness
The agent opens the application and its attachments and checks them against the guideline's list of attachments. It names each missing attachment individually.
Antrag_Radwegenetz_2026.pdf with 6 attachmentsChecks funding applications for completeness and consistency before submission.
Developed in Germany · Hosted in the EU or on-premises
Delivered together with
An application goes into the funding portal with an inconsistent cost plan. The approving authority sends it back, and both sponsor and funding body work through the entire application a second time.
Item 7 of the cost plan costs the sponsor 19 days while the programme's application deadline keeps running. Recalculating before submission avoids the return and makes assessment 40 to 60% faster.
This sequence shows a municipal funding application being returned. The percentage range is the headline figure from this agent's fact sheet and was not measured on this application.
The agent opens the application and its attachments and checks them against the guideline's list of attachments. It names each missing attachment individually.
Antrag_Radwegenetz_2026.pdf with 6 attachmentsThe agent recalculates the cost plan items against the stored template. It shows the item where the total stops adding up.
Cost plan with 14 items, discrepancy in item 7The agent compares the stated indicators with those in the guideline. The review note is drafted for approval.
Pruefvermerk_Radwegenetz_2026.docx with 6 findingsIt collects findings and assigns them to the relevant attachment. The approving authority decides on the funding.
It recalculates the items against the stored template and shows where the total stops adding up. Whether the amount estimated for the route section is justified is for the technical review in the funding procedure to weigh.
The sponsor obtained them and keeps them in its own files. The agent recalculates the items but cannot see where a figure comes from.
Connected systems
Operations
A pilot typically runs on your own data within 4 to 6 weeks. The agent connects to your existing systems rather than running as a separate, parallel environment.
EU cloud, private cloud or on-premises. Processing is GDPR-compliant and models are never trained on your data. Details in the Trust Center.
It is based on experience from comparable projects and process benchmarks, not a commitment. We work out the realistic effect for your organisation during the assessment before the pilot.