Check the order load against capacity
Capacity view for week 37, CNC cell 4 with 118 hours booked against 96 available
Industry
Where it does not add up, you hear it on the line.Open agent
Enlarge demo
Developed in Germany · Hosted in the EU or on-premises
Delivered together with
The rush order comes in from sales and is loaded into the ERP. Work preparation then pulls the free shifts from the MES and the material coverage from the SCM, and moves the affected production orders by hand. The early shift reports the next morning what that has done to the bottleneck cell.
1
rush order
Customer order KD-7742 brings 400 housings forward by eight days.
6
production orders
Six orders already loaded share the same CNC cell.
3
data sources
Capacity, material and dates sit in three systems and are queried one by one.
4 hours
replanning by hand
That is how long the new weekly plan takes, and the result is a single variant with nothing to compare it with.
On Monday morning, the bottleneck cell runs to a weekly plan that the production manager chose from two variants calculated by work preparation with 15 to 25% higher planning efficiency.
The 15 to 25% gain in planning efficiency is this agent's headline figure. The four hours of replanning and the six affected production orders reflect a typical Tuesday in work preparation; they are not measured.
The agent calculates plan variants and puts their bottlenecks side by side; the production manager decides which variant runs.
Capacity view for week 37, CNC cell 4 with 118 hours booked against 96 available
FA-48213 ready to start from 9 September, bought-in 6 mm seal not arriving until 11 September
Variant sheet with 2 scenarios, variant B moves 3 orders and keeps 5 commitments
It presents the variants with their effect on delivery dates. The production manager releases the weekly plan, and work preparation triggers the loading in the ERP.
It calculates with the stored routings and set-up times. Work preparation decides which cell can technically run a part.
If the workshop steps in at peak times with an extra drilling station, that reserve does not appear in any variant. Work preparation adds it by hand.
Connected systems
ERP production planning
MES shop-floor control
SCM material planning
Operations
Deployment model
Data processing
Responsible teams
How quickly is the Production Planning Agent ready to use?
Where is the data processed?
Where does the figure “15 to 25% higher planning efficiency” come from?
All agents
20 to 30%
fewer unplanned stoppages
Maintenance, engineering
25%
less planning effort
Workforce planning, production
30%
fewer delivery delays
Supply chain, purchasing
30%
faster service turnaround
Service, after-sales
40%
less documentation effort
Quality assurance, quality manager
45%
faster fault resolution
Service, technical field service