Production Planning Agent

The weekly plan changes on screen. Where it does not add up, you hear it on the line.

Optimises production plans based on order, capacity and material data.

Optimises production plans based on order, capacity and material data.

Open agent

Enlarge demo

Public administration

Four processes that take up the most time today

Developed in Germany · Hosted in the EU

Developed in Germany · Hosted in the EU or on-premises

Delivered together with

Sovereign hosting in Germany, single-tenant from the first user.

Sovereign hosting in Germany, single-tenant from the first user.

Legal, tax and compliance expertise for legally sound deployment.

Legal, tax and compliance expertise for legally sound deployment.

Advisory and implementation for the public sector, starting with the AI readiness assessment.

Advisory and implementation for the public sector, starting with the AI readiness assessment.

One brought-forward delivery date moves the weekly plan in six places.

The rush order comes in from sales and is loaded into the ERP. Work preparation then pulls the free shifts from the MES and the material coverage from the SCM, and moves the affected production orders by hand. The early shift reports the next morning what that has done to the bottleneck cell.

1

rush order

Customer order KD-7742 brings 400 housings forward by eight days.

6

production orders

Six orders already loaded share the same CNC cell.

3

data sources

Capacity, material and dates sit in three systems and are queried one by one.

4 hours

replanning by hand

That is how long the new weekly plan takes, and the result is a single variant with nothing to compare it with.

On Monday morning, the bottleneck cell runs to a weekly plan that the production manager chose from two variants calculated by work preparation with 15 to 25% higher planning efficiency.

The 15 to 25% gain in planning efficiency is this agent's headline figure. The four hours of replanning and the six affected production orders reflect a typical Tuesday in work preparation; they are not measured.

Three steps through the process.

The agent calculates plan variants and puts their bottlenecks side by side; the production manager decides which variant runs.

1.

1.

Check the order load against capacity

The agent reads the open production orders from the ERP and the week's shift allocation from the MES. It flags every cell whose load exceeds the time available.

The agent reads the open production orders from the ERP and the week's shift allocation from the MES. It flags every cell whose load exceeds the time available.

Capacity view for week 37, CNC cell 4 with 118 hours booked against 96 available

2.

2.

Check material coverage for each order

The agent checks the bills of materials for the affected orders against stock and goods receipt dates from the SCM. If a part will not be in stock by the planned start date, it notes its arrival date on the order.

The agent checks the bills of materials for the affected orders against stock and goods receipt dates from the SCM. If a part will not be in stock by the planned start date, it notes its arrival date on the order.

FA-48213 ready to start from 9 September, bought-in 6 mm seal not arriving until 11 September

3.

3.

Hand plan variants to the production manager

The agent compares two variants, each with its on-time delivery, set-up time and the bottleneck that remains. The production manager chooses one and releases the weekly plan.

The agent compares two variants, each with its on-time delivery, set-up time and the bottleneck that remains. The production manager chooses one and releases the weekly plan.

Variant sheet with 2 scenarios, variant B moves 3 orders and keeps 5 commitments

What the agent does not do.

It does not load any production order itself.

It does not load any production order itself.

It presents the variants with their effect on delivery dates. The production manager releases the weekly plan, and work preparation triggers the loading in the ERP.

It does not judge whether a machine can hold the part's tolerance.

It does not judge whether a machine can hold the part's tolerance.

It calculates with the stored routings and set-up times. Work preparation decides which cell can technically run a part.

It does not count capacity outside the workstations managed in the MES.

It does not count capacity outside the workstations managed in the MES.

If the workshop steps in at peak times with an extra drilling station, that reserve does not appear in any variant. Work preparation adds it by hand.

Connected systems

ERP production planning

MES shop-floor control

SCM material planning

Operations

Deployment model

EU cloud or private cloud

EU cloud or private cloud

Data processing

GDPR-compliant, no model training on your data

GDPR-compliant, no model training on your data

Responsible teams

Production management, work preparation

Production management, work preparation

The questions that come up before the first meeting.

How quickly is the Production Planning Agent ready to use?

Where is the data processed?

Where does the figure “15 to 25% higher planning efficiency” come from?

Related agents.

All agents

Platform

Industries

Services

Resources

Company

Pricing

From AI strategy to a running platform: we show you the way.

Talk to us

Log in

DE

EN

English

Platform

Industries

Services

Resources

Company

Pricing

From AI strategy to a running platform: we show you the way.

Talk to us

Log in

DE

EN

English
neuland.ai

The AI management and orchestration platform from Cologne.

Developed in Cologne. Operated in the EU or in your data center.

Certifications and compliance: ISO 27001, ISO 9001, GDPR, EU AI Act, DORA, StBerG, and BRAO
WirtschaftsWoche Best of Technology 2026 seal, 2nd place in the Process Management category for neuland.ai

© 2026 neuland AI AG