Read machine data for anomalies
Press PR-14, bearing temperature up from 62 to 78 degrees over 3 runs
Industry
is in no maintenance plan.Open agent
Enlarge demo
Developed in Germany · Hosted in the EU or on-premises
Delivered together with
The press fails in the middle of the late shift. Neither the spare part nor the technician is on site, so the order moves to the backup machine, which runs more slowly. The note about the rising bearing temperature had been in the log for three runs, but nobody read it in context.
26
machines
Twenty-six machines in the plant each have their own maintenance cycle.
3
early warnings
On press PR-14, temperature and running noise rise over three runs.
1
bearing failure
The damage brings the machine to a halt in the middle of the late shift.
9 hours
of downtime
Sourcing the spare part and the repair take up nine hours that no shift can make up.
The path to 20 to 30% fewer unplanned stoppages starts with a maintenance order already drafted at the second temperature rise, with the sensor trend as its justification.
The 20 to 30% reduction in unplanned stoppages is this agent's headline figure. Nine hours of downtime and three early warnings at the press describe a typical sequence in a plant with 26 machines; none of it was measured.
The agent spots maintenance needs from run, sensor and log data; the head of maintenance sets the order of the jobs.
Press PR-14, bearing temperature up from 62 to 78 degrees over 3 runs
Window on Saturday 6 June, bearing set in stock, technician with additional qualification not scheduled
IH-60421 in draft, proposed priority 1 of 7 open orders, reasoning with sensor trend
It reports the trend and proposes a window. The head of maintenance is responsible for shutdown and order approval.
It shows the rise from 62 to 78 degrees over three runs. The maintenance technician on site judges how long the machine can safely keep running.
The manual press in hall 2 supplies no measurement series, so it stays on the fixed cycle from the maintenance plan. The agent keeps it on the list without a trend assessment.
Connected systems
Maintenance management system
MES machine data
ERP spare parts store
Operations
Deployment model
Data processing
Responsible teams
How quickly is the Servicing Planning Agent ready to use?
Where is the data processed?
Where does the figure “20 to 30% fewer unplanned stoppages” come from?
All agents
15 to 25%
higher planning efficiency
Production management, work preparation
25%
less planning effort
Workforce planning, production
30%
fewer delivery delays
Supply chain, purchasing
45%
faster fault resolution
Service, technical field service
30%
faster service turnaround
Service, after-sales
40%
less documentation effort
Quality assurance, quality manager