Collect fleet KPIs from the specialist systems
Fleet report Q2, 17 KPIs from 4 reports, 6 of them from the fleet management system
Logistics
The slide deck is built from scratch every time.Open agent
Enlarge demo
Developed in Germany · Hosted in the EU or on-premises
Delivered together with
Availability, cost per kilometre, damage rate and utilisation sit in different reports with different cut-off dates. Controlling exports each one, aligns the periods and builds the slides from them. In the end, the commentary focuses on the swing compared with the previous quarter, and for that someone has to dig back into the individual cases.
4
reports
Availability, cost per kilometre, damage rate and utilisation come from separate systems.
17
KPIs in the report
That is how many values the board report carries in its fixed structure.
2 days
slide building
Exporting, aligning the cut-off dates and building the slides take up two working days.
8
reports a year
The cadence has risen from four meetings to eight.
Across eight meetings a year, two days of slide building add up to sixteen working days, and with a finished draft to proofread this reporting effort falls by up to 70%.
This agent's headline figure is up to 70% less reporting effort. The 17 KPIs and the eight meetings a year describe a typical reporting situation in the fleet business, not the result of a count.
The agent comments on every swing in the report and cites its source; the board assesses the trend.
Fleet report Q2, 17 KPIs from 4 reports, 6 of them from the fleet management system
Cost per kilometre in distribution haulage, comment with 6 individual cases
flottenbericht_q2_entwurf.pptx, 14 slides, source sheet per KPI
It provides the draft with the source sheet. Controlling decides who presents and which statements stay in.
It describes the movement and the source reference of every KPI. The head of logistics sets out the consequences for the board.
It builds the draft from the connected KPIs. If controlling adds the resolution from the minutes to the structure, the agent picks it up on the next run.
Connected systems
Fleet management system
ERP system
business intelligence
Operations
Deployment model
Data processing
Responsible teams
How quickly is the Board Report Agent ready to use?
Where is the data processed?
Where does the figure “up to 70% less reporting effort” come from?
All agents
60%
less preparation time
Executive board, management
10 to 15%
cost savings
Controlling, management
up to 70%
less reporting effort
Sustainability, sales, customer service
60%
less research time
Funding, Finance, Executive Management
40%
faster risk analysis
Operations, management
30%
fewer SLA breaches
Customer service, operations