Check whether a permit is required
Reference 32.1/SNE-2026-0417, 2 attachments including site plan
Administration
The application comes in as one.Open agent
Enlarge demo
Developed in Germany · Hosted in the EU or on-premises
Delivered together with
A construction company applies to put up scaffolding over the pavement on Marktstraße for the duration of a façade renovation. The case needs a special use permit, a traffic order for the signage and a fee notice calculated by area and number of days.
1
application
Scaffolding on the pavement, received in the public order specialist system.
3
legal consequences
Permit, traffic order and fee all attach to the same area.
2
offices
The road traffic authority and the fee office handle the same case separately.
6
duplicated steps
Three legal consequences across two offices, and a two-week extension sets all six steps in motion again.
Six duplicated steps drop to three, because permit, order and fee come out of a single pass: 50% faster processing.
The 50% comes from the product description. The figure only becomes reliable once you check it against your own case numbers at the public order office.
The agent works out whether a permit is required and what fee the bylaw sets. The case officer grants the permit itself.
Reference 32.1/SNE-2026-0417, 2 attachments including site plan
Tariff item 2.4, 12 square metres over 42 days of use
sne-0417-vorlage.docx with 3 attachments
The agent submits the draft with its conditions. The permit is an administrative act and needs the case officer's signature.
Whether the remaining pavement width on Marktstraße is enough for pedestrians and as an emergency route is a traffic assessment and stays with the road traffic authority. The agent checks the site plan against the bylaw and flags that the case needs a traffic order.
It works with the 42 days of use stated in the application. If the scaffolding stays up longer, the public order office's field staff see it on the pavement, and the fee is recalculated without the agent.
Connected systems
Public order specialist system
electronic file
budgeting and payment systems
Operations
Deployment model
Data processing
Responsible teams
How quickly is the Special Use Permit Agent ready to use?
Where is the data processed?
Where does the figure “50% faster processing” come from?
All agents
50%
lower risk of annulment
Permitting authorities, nature conservation, legal department
60 to 75%
time saved per case
Social welfare office, citizens' office, benefits offices
55%
fewer missed deadlines
Immigration office, migration office
50%
shorter idle times
Citizenship authority, migration office
40%
less review effort
Building authority, building control, urban planning
45%
fewer queries
Trade licensing office, market administration