Break the specification down into items
Specification for tender 2026-VG-3084, 900 items, 6 trades captured
Industry
Only someone who reads all of it finds what fits.Open agent
Enlarge demo
Developed in Germany · Hosted in the EU or on-premises
Delivered together with
The specification arrives as a PDF from the e-procurement platform, structured by trade rather than by your product range. Whoever reads it checks every item against the product master and translates the contracting authority's description into the company's own terms. If several tenders land in the same week, reading time decides which ones get handled at all.
900
items
That is how many lines the specification for this tender contains.
6
trades
Only two of the six trades touch your product range.
40
matching items
These two trades leave around forty items the company can supply.
2 days
of reading time
Finding these forty currently takes two working days of an experienced specialist.
The tender specialist ends up reading 60% less, because the forty items arrive with references instead of the full 900 lines.
The 60% reduction in reading time per tender is this agent's headline figure. Around forty matching items out of 900 is a typical profile for a specification; the figure was not counted.
The agent pulls the items the company can supply out of the specification, with references; sales weighs up whether the bid is worth it.
Specification for tender 2026-VG-3084, 900 items, 6 trades captured
40 items matched, 9 of them partial matches with differing details
positionsliste_2026-VG-3084.xlsx, 40 lines with page references
It presents the matching items with references. Sales decides whether the company bids.
For partial matches, it notes how the item differs from your own product. The sales engineer clarifies feasibility with the costing team.
If a bidder answer changes an item description, the new version of the specification has to be loaded again.
Connected systems
E-procurement platform
product master in the ERP
costing system
Operations
Deployment model
Data processing
Responsible teams
How quickly is the Specification Guide Agent ready to use?
Where is the data processed?
Where does the figure “60% less reading time per tender” come from?
All agents
50%
more bidding phases reached
Sales, bid management
40%
faster research cycles
Strategy, Product Development
60%
less preparation time
Executive board, COO
55%
faster quotation preparation
Inside sales, costing
45%
less preparation time
Key Account Management, Sales
60%
less reading time
Engineering, quotation management